Repairs Completed on Railway Bridge Affected by Sabotage in Bolan

Repairs Completed on Railway Bridge Affected by Sabotage in Bolan

The railway bridge in the Dozan area of Bolan, which was damaged due to sabotage, has been successfully repaired. According to railway authorities, train services will resume from Quetta to other parts of the country starting October 11.

A successful trial run was conducted, with a railway engine and train passing over the restored bridge. The Jaffar Express is scheduled to depart for Peshawar at 9 AM tomorrow, while the Bolan Mail is set to leave Quetta for Karachi on October 13.

Imran Hayat, the Divisional Superintendent of Railways Quetta, conducted an inspection of the trial run. This restoration follows the sabotage incident that occurred on August 26, which led to the bridge’s significant damage.

Spread the love

Related post

Austria Inaugurates Honorary Consulate in Karachi as Bilateral Ties with Pakistan

Austria Inaugurates Honorary Consulate in Karachi as Bilateral Ties…

KARACHI — In a significant diplomatic development, Austria inaugurated its Honorary Consulate in Karachi on Friday, coinciding with the celebration of 70…
Pakistani PM Shehbaz Orders Rekodiq-Railway Link Completion by 2028

Pakistani PM Shehbaz Orders Rekodiq-Railway Link Completion by 2028

ISLAMABAD — Prime Minister Muhammad Shehbaz Sharif has directed authorities to ensure Rekodiq is linked to the national railway network by 2028,…
Iran Arrests Mossad Operatives, Seizes Explosives and Drone Equipment Amid Escalating Conflict

Iran Arrests Mossad Operatives, Seizes Explosives and Drone Equipment…

Report by “Safarti Tarjuman” International News Desk TEHRAN — Iranian authorities have arrested four operatives linked to Israel’s Mossad intelligence agency…

Leave a Reply

Your email address will not be published. Required fields are marked *